Composites World / NetComposites

Connecting you to the composites industry

Advertisement

NetComposites Ltd has transferred the rights and ownership of this website to Gardner Business Media Inc.

On 1st January 2020, NetComposites' media assets including netcomposites.com, newsletters and conferences were transferred to Composites World (Gardner Business Media).

This site is no longer being updated. Please direct all enquiries to netcomposites@gardnerweb.com.

For further details see our joint press release.

Final Assembly Begins on Fifth Boeing 787 Dreamliner

  • Wednesday, 7th May 2008
  • 0 comments
  • Reading time: less than a minute

Final assembly began last week on the third flight-test airplane for the Boeing 787 Dreamliner.

This is the fifth Dreamliner to be loaded into the first position of the 787 production system. The static test airframe moved April 25 from the Final Assembly to its test rig in another bay of the Everett, Wash.-based factory. Both the fatigue test airframe and the second flight-test airplane have advanced to the next position in production, where assembly and systems installation work continues.

“”We are receiving assemblies that are much more complete,”” said Jack Jones, vice president of 787 Final Assembly and Change Incorporation. Jones replaces Steve Westby, who retired from Boeing yesterday after a 31-year career. “”The second flight-test airplane had a 50 percent reduction in the amount of incomplete work as compared to the first airplane. ‘Traveled work’ on this airplane is 65 percent less than on the first.””

After assembly is complete, this airplane will be fitted with an interior as part of the comprehensive flight-test program and certification process.

“”When that happens this summer, it will be the first time we’ll see the 787 in what is close to a final delivery configuration,”” Jones said.


For more information visit:


Share this article


More News


Comments (0)

Leave your comment