Composites World / NetComposites

Connecting you to the composites industry

Advertisement

NetComposites Ltd has transferred the rights and ownership of this website to Gardner Business Media Inc.

On 1st January 2020, NetComposites' media assets including netcomposites.com, newsletters and conferences were transferred to Composites World (Gardner Business Media).

This site is no longer being updated. Please direct all enquiries to netcomposites@gardnerweb.com.

For further details see our joint press release.

Final Assembly Begins on Another Boeing 787 Dreamliner

  • Monday, 18th February 2008
  • 0 comments
  • Reading time: less than a minute

Final assembly started on Friday on the second flight-test airplane for the Boeing 787 Dreamliner.

Loaded into the first position of the 787 production system, workers in the Everett, Wash.-based factory can now begin joining together the fuselage sections and wings. All major joins take place in this position. While this is the second of six flight-test airplanes, this Dreamliner is actually the fourth on the production line. It follows the two airplanes that will be used for static and fatigue testing.

“”We’ve received significantly less ‘traveled work’ on this airplane,”” said Steve Westby, vice president of 787 Final Assembly and Change Incorporation. “”The degree of completeness of sections at the partners is significantly better than Airplane #1. Condition of assembly is much better and we will see continued improvements on the condition of each assembly shipped. All this helps to bring us back into alignment with the original design of our production system.””

Currently 21 airplanes are in various stages of production. This number includes the static and fatigue airplanes, which will not be delivered to customers. Since its launch in April 2004, the 787 Dreamliner has amassed 857 firm orders valued at $144 billion from 56 airlines.


For more information visit:


Share this article


More News


Comments (0)

Leave your comment