Composites World / NetComposites

Connecting you to the composites industry

Advertisement

NetComposites Ltd has transferred the rights and ownership of this website to Gardner Business Media Inc.

On 1st January 2020, NetComposites' media assets including netcomposites.com, newsletters and conferences were transferred to Composites World (Gardner Business Media).

This site is no longer being updated. Please direct all enquiries to netcomposites@gardnerweb.com.

For further details see our joint press release.

Boeing Composite Manufacturing Center Begins Fabricating 787 Vertical Fin

  • Sunday, 24th September 2006
  • 0 comments
  • Reading time: about 2 minutes

Fabrication of the first composite stringers for the 787 vertical fin, Boeing’s all new commercial airplane, began last week at the Composite Manufacturing Center (CMC) at Boeing Frederickson.

The vertical fin is the largest major Boeing 787 Dreamliner assembly built by an internal Boeing supplier. CMC plans to deliver its first fully functional vertical fin to 787 Final Assembly in Everett, in Spring 2007.

To accommodate the new work, the Boeing Fabrication manufacturing business unit is streamlining its factory, implementing a pulsed moving line for the 787 vertical fin. This will allow both the 787 vertical fin and 777 empennage to be built in the building’s original footprint.

Boeing’s Composite Manufacturing Center is responsible for designing the entire structure, including composite and metal subcomponents; manufacturing and assembling the vertical fin’s main box, or centre section; working together on supplier selection and co-management; integration of sub-tier-supplied components; functionally testing and certifying all structures and systems, such as hydraulics, electronic actuators, signal lights and wires; delivering on-time; and providing life-cycle support.

Fabrication start of the 787 vertical fin began with the push of a button by Boeing CMC employee, Don Hall, flat tape laminating machine operator. The process involves laying down composite tape to build up a “”charge,”” with the part then formed on a tool and cured in a large autoclave prior to assembly.


For more information visit:


Share this article


More News


Comments (0)

Leave your comment