Looking for our consultancy, conferencing, training or innovation services? Visit netcompositesenterprise.com

NetComposites Now
AMCA

Dura Cladding Helps Landmark Development Achieve Sustainability Goals

13 June 2017

Dura Cladding Helps Landmark Development Achieve Sustainability Goals

Composite timber cladding from Dura Composites was chosen for a new retail, leisure and tourism destination at Rushden Lakes, near Northampton, UK.

HPW Architecture led the design and development of the masterplan for the project, which is set in an area of outstanding natural beauty and centres around restoring public access to a network of lakes, as well as offering shopping and leisure facilities. The development is situated adjacent to a Site of Special Scientific Interest and is a designated nature reserve and it was critical that the design and construction processes embraced the challenges and opportunities provided by this unique setting. In consultation with the Wildlife Trust and Natural England, HPW designed three net-zero energy buildings (NZEBs), which are clad in Dura Cladding from Dura Composites.

The net-zero energy buildings, the Boathouse, Wildlife Trust Visitors Centre and the Management Office, are distinguished from other buildings in the development through the use of Dura Cladding Type 150 Flush in Cedar colour. All three buildings are super-insulated with all required energy for operation generated on-site to keep running costs to a minimum.

The retail buildings on the terraces are part clad in Dura Cladding Type 150 Flush in Grey to provide a contrasting finish whilst retaining the aesthetic look, durability, UV performance and sustainable credentials that the developers were looking for.

“This is a unique project and one which we have been delighted to have been involved in right from the concept stage eight years ago," says Gary Wilburn, Director of Design and Sustainability for HPW. "At HPW we specialise in projects like this where wildlife and the natural surroundings are a key part of the design, and we’re really pleased with the role that the Dura Cladding in both Cedar and Grey have played in helping us maintain that ethos. With a project on this scale it’s important to ensure that the resulting development delivers on all of its promises and the recycled properties of Dura Cladding, together with its FSC status have helped us to meet our overall sustainability goals. The low-maintenance benefits of a composite timber cladding combined with the peace of mind provided by the product warranty have contributed towards a genuine legacy for future generations of which we are very proud.”

The first phase of the Rushden Lakes development is due to open in July and will be followed by phase two of the scheme, which includes additional shops, restaurants and a 14-screen cinema.


Photo provided by Dura Composites





comments powered by Disqus

Related / You might like...

A Joint Success in Bridge Repair Using Composites

The University of Southern Queensland’s (USQ) Centre for Future Materials (CFM) has partnered with Joinlox to investigate a prefabricated composite repair system with an easy-fit and self-locking mechanical joint called PileJax.

Call for Papers Announced for Composites Innovation 2018

Papers are now invited for the 2018 Composites Innovation Conference, an international conference and exhibition taking place on 20th -21st June 2018 at the Nottingham Conference Centre, Nottingham, UK.

Limited Exhibitor Space Remaining at UK Composites Show

The UK's Advanced Engineering 2017 trade show has announced that its Composites Engineering zone is now over 90% full with only 10 stands remaining.