NetComposites
Thermwood

Prime Minister Opens Bombardier’s New Wing Facility in Belfast

15 October 2013

The UK Prime Minister, David Cameron, opened Bombardier’s new wing manufacturing and assembly facility in Belfast, UK.


Composites Evolution's Biotex Flax/PLA Materials Used in 100% Biodegradable Furniture

15 October 2013

Composites Evolution’s Biotex commingled Flax/PLA materials have been chosen by a furniture designer from Sheffield Hallam University to develop novel biodegradable furniture.


JEC Americas Highlights Acceleration in New Composites Materials and Manufacturing

15 October 2013

JEC says the second annual JEC Americas Composites Show and Conference, held at the Boston Convention and Exhibition Center, US from 2 – 4 October, reflected the growing commerce, collaboration and innovation that have come to typify the region’s dynamic composite market.


Phase II of Composite Data Management Project to Extend Support for Composite Innovation

15 October 2013

Granta Design it has announced Phase II of a project to enable effective management of composite materials information, providing essential support for organisations that are innovating in their use of composites.


Shimtech Group Strengthens Position in Composites with US Acquisition

15 October 2013

Shimtech has agreed to acquire Performance Plastics (PPI) for an undisclosed sum.


Cytec Launches Two New Prepreg Systems for Railway Rolling Stock Applications

15 October 2013

Cytec is adding two new products to its rail portfolio that meet the fire requirements of EN45545-2:2013.


Huber Announces Prices Increase for Industrial Ground Calcium Carbonate

15 October 2013

Huber Engineered Materials has announced a price increase for its industrial calcium carbonate products. 


Bond-Laminates Expands Lightweight Plastics Production in Brilon, Germany

15 October 2013

Bond-Laminates, a wholly owned subsidiary of LANXESS, say it is strengthening its business with innovative Tepex lightweight plastics.


DSM Congratulates Nuon Solar Team on World Solar Challenge Victory

15 October 2013

DSM provided the resins and application technology used to build the solar car, which travelled from Darwin to Adelaide, Australia, in less than five days.