NetComposites
Advanced Engineering 2019

Beechcraft King Air 90x Composite Winglets Certified

18 June 2010

Beechcraft King Air 90x composite winglet testing and certification is complete and winglets for King Air C90 and E90 models are now available for installation at the company’s network of factory-owned service centres.

The winglet system increases wing aspect ratio to reduce induced drag and allows the King Air to fly faster on less fuel. By increasing wing surface area, the winglets provide greater slow speed handling and improved stability at higher flight levels.

Introduced at last summer’s EAA AirVenture, the King Air 90x upgrade is a two-part conversion that synergizes the aerodynamic benefits of winglets with a gross weight increase to create enhanced King Air 90 handling/range/payload capability.

“The King Air 90x package provides added value and versatility to an aircraft that already has a well-deserved reputation as a workhorse,” said Christi Tannahill, HBC vice president, Global Customer Support. “By combining the upgrades and accomplishing the modifications during a single service event, operators can effectively multiply the return on their investment several times over. Additionally, the performance enhancements gained through the installation of the winglets will, over time, provide enough fuel savings to offset much of the cost of the modification.”





Share this story


Related / You might like...

Impossible Objects and UAMMI Test First 3D Printed Carbon Fibre Part for US Air Force

Impossible Objects has lifted the lid on an exciting collaboration with Utah Advanced Materials & Manufacturing Initiative (UAMMI) focusing on defense applications.

Web Industries to Purchase Seattle-area Land for New Aerospace Composite Materials Processing Plant

Web Industries has signed a letter of intent with East Forty to purchase 12 acres of land for a manufacturing plant in Marysville, Washington, north of Seattle, US.

Tecniplas Exports Composite Tanks to Argentina

Tecniplas has just dispatched two reservoirs to Argentina. The tanks will be installed in the pulp mill that Arauco operates in the city of Puerto Esperanza, in the province of Misiones, Argentina.