NetComposites
Airtech

Progress Made in Boeing 787 Dreamliner Production

19 December 2007

The Boeing production line is full for the all-new 787 Dreamliner, as work continues on the first flight-test airplane and two airplanes to be used for static and fatigue testing.

This photo shows Airplane #1 in the third position, where final structure and systems installations are completed. Behind it, the static-test airplane is in the second position, where it will receive landing gear, engines, and any required interior installations. The fatigue airplane entered final body join Nov. 30.






comments powered by Disqus